I-35 Construction near Lady Bird Lake begins soon

I-35 Construction near Lady Bird Lake begins soon

[ad_1]

AUSTIN (KXAN) — A new phase of I-35 construction in downtown Austin is starting. The I-35 Capital Express Central project is already underway at Martin Luther King Jr Blvd, and today the Texas Department of Transportation announced it’s starting the next phase by Lady Bird Lake.

I-35 Construction near Lady Bird Lake begins soon

Drivers will soon notice changes along I-35 from Holly Street to the intersection of I-35 and Hwy 71 down south, as TxDOT constructs two high-occupancy-vehicle lanes.

The I-35 CapEx Central project will also reconstruct the Lady Bird Lake bridge, construct a single-point urban interchange at Riverside Drive and a pedestrian-only bridge at Woodland Ave. The interchange at Riverside Dr will accommodate future Capital Metro light rail routes. There will also be improvements to bicycle and pedestrian paths along the I-35 corridor through Austin.

The plan also includes sinking the main lanes of I-35 through downtown and adding what’s called Cap and Stitch above the highway that will essentially cover I-35 with park space. The funding for that plan is still in the works.

The public won’t see significant impacts or lane closures around Lady Bird Lake for a few more months.

[ad_2]

Source link

Posted in

Sophie Clearwater

Vancouver-based environmental journalist, writing about nature, sustainability, and the Pacific Northwest.

Leave a Comment